| More about our history |
Buildings |
The 2001 remodeling project and addition to the elementary building consists of: A two-story addition of 10 classrooms, computer lab, and library. Installation of an elevator servicing both the two-story addition and the older three-story building. Complete remodeling of the older sections of the building including new windows, refinishing of the oak woodwork, new floor coverings, and lowered ceilings. Modernized kitchen equipment and remodeled cafeteria. Two new playground areas; one for younger children and one for older students.
The secondary building (built in 1989) offers: Three computer labs. ICN room. Fully equipped industrial tech program. Two gymnasiums: a new practice gym added in 2000. Athletic fields adjacent to the building. |